As part of the survey, design, and engineering services for the 26 km long Siirt-Kurtalan High-Speed Railway Line, the modeling of 13 tunnels with a total length of 6 km, including their entrance and exit portals, has been completed. Implementation projects for these tunnels have also been prepared.