As part of the survey, design, and engineering services for the 102 km long Çorum-Merzifon High-Speed Railway Line, the modeling of 11 tunnels with a total length of 14 km, including their entrance and exit portals, has been completed. Additionally, implementation projects for these tunnels have been prepared.

Bir yanıt yazın

E-posta adresiniz yayınlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir

Fill out this field
Fill out this field
Lütfen geçerli bir e-posta adresi yazın.
You need to agree with the terms to proceed