For the Muratlı-Güreşen Junction Bridge located on the Muratlı-Güreşen Road (Km: 0+839.62 – 1+199.62), implementation projects for caisson excavation and support systems of the inclined cable-stayed special bridge foundations have been prepared.
Additionally, detailed implementation projects covering the foundation designs for the bridge pier system and its construction phases were also developed.